Renovation of the Physics-Chemistry/Biology laboratory
We are honoured and pleased to announce that the physics-chemistry/biology laboratory was completely renovated before the start of the 2025 school year, partly thanks to the valuable help of the Rhône-Alpes Region: all the lab benches have been replaced. The laboratory now has 15 computers built into the benches.
In addition, we have equipped the laboratory with sinks and new taps.
The walls and the ceiling have been redone. A new state-of-the-art video projector has been installed, as well as a new board. Discover the photos: